Increased productivity of cement mills through modernization of aspiration systems

The paper proposes a method for reducing specific energy consumption by cement grinding in ball and tube mills (BTM). The results after modernization of aspiration systems according to the proposed method at the cement plants of AO EUROCEMENT Ukraine are provided. A reduction in specific energy consumption of 10 kW • h/t of cement was achieved.
Author: V.V. Gorgolyuk, D.A. Serebryansky, D.L. Anikin

Share:  
You can apply for a subscription or order a specific issue of our journal here.
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy