Modernisation of cement mill № 6

Modernisation of cement mill №6 was performed at "Shchurovsky Cement". It included the changeover to closed cycle grinding by installing a third-generation high-efficiency ODK separator and other equipment from Christian Pfeiffer. The article describes the design and operating principle of the QDK separator and demonstrates its advantages. As a result of modernization the goals set were fully achieved. The capacity of the mill was increased, specific power consumption was reduced, cement quality improved, universality for the production of various types of cement was assured.
Author: S.I. Volkov, E. Pichlmaier

Share:  
You can apply for a subscription or order a specific issue of our journal here.
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd