Highly efficient shredding of waste in RDF production

Nowadays, cement manufacturers are increasingly feeding refuse-derived fuels not only to the main burner, but also to the preheater. The material for the latter does not have to have the same particle size as is needed in the main burner. What is more, the calorific value may also be lower. With the VEZ 3200, Vecoplan is supplying a solution which can shred various materials in a single-stage or two-stage process with pre-shredding and secondary shredding – with different particle sizes as required.
Author: T. Hamer

Share:  
You can apply for a subscription or order a specific issue of our journal here.
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy