Replacement of the natural gypsum stone in the production of cement with industrial wastes

The article is focused on the current problem of recycling phosphogypsum, one of the many types of industrial wastes generated in large amounts at OAO Gomel Chemical Plant. The authors present the results of studies of artificial gypsum rock production by neutralizing various types of phosphogypsum: calcium sulfate hemihydrate contaminated with phosphorus (a waste product of phosphoric acid extraction by hemihydrate method) and phosphorus-contaminated calcium sulfate dihydrate (a waste product of its production by dihydrate method). The experimental data confirmed the possibility of replacing the natural gypsum rock imported to the Republic of Belarus for the production of cement based on clinkers of Belarusian cement plants with the synthetic one and its effect on the hydration of clinker minerals.
Author: V.I. Lobachevsky, A.G. Gubskaya, P.I. Pismensky

Share:  
You can apply for a subscription or order a specific issue of our journal here.
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy