OAO Spassk-Cement in 2006.

The article cites the results of operations of OAO Spassk-Cement in 2006 aimed at escalating the volume of cement production and modernization of technological process. The output of cement grew by 2.5 %, and that of clinker by 4.4%. The mining equipment was considerably upgraded, drying drum was reconstructed and converted to coal burning.
Work on adaptation of the quality control system by to new requirements was performed. A great amount of attention was given to the development of the social sphere
Author: I.S. Sokolyuk

Share:  
You can apply for a subscription or order a specific issue of our journal here.
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy