Physical and chemical parameters of foam-concrete mix transformation.

The article cites the results of a study aimed at determination of the hydration time of binders needed to ensure foam concrete production according to the cutting technology. It is suggested to introduce a complex additive in order to reduce the binder hydration time.
Author: A.M. Sycheva, E.A. Popova, A.V. Khitrov, D.I. Drobyshev

Share:  
You can apply for a subscription or order a specific issue of our journal here.
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy