On September 25—26 in Duesseldorf, Germany LOESCHE Symposium 2014 was held. It was attended by more than 350 guests from 55 countries. An overview of ...
In August 2014 the Siberian Cement holding company turned 10 years old. The article describes the structure of the holding; lists the products of its ...
Issue №5, 2014 |
Section: Jubilees |
Keywords: cement production, construction materials, modernization, ecology |
On September 25, 1969 the first production line of the Stary Oskol cement plant, later named Oskol-Cement, was put into operation, today being part of...
Issue №5, 2014 |
Section: Jubilees |
Keywords: cement plant, process line, product range |
Autor: Ye.N. Yevsyukov. |
Georgia is a strategically well located country with a big potential for growth. Particularly, it is a transit country between the Black and the Caspi...
Issue №4, 2014 |
Section: Review |
Keywords: cement industry in Georgia, cement production, construction in Georgia |
Autor: I. Makharoblidze. |
The article describes the main characteristics of the silica and calcium species of fly ash, their use in the composition of cement, and the effect on...
Issue №4, 2014 |
Section: Application of cement |
Keywords: fly ash, pozzolana, cement |
Autor: Z. Giergiczny. |
Development of new CEM X cements based on ground granulated blast furnace slag, fly ash and clinker.
Issue №4, 2014 |
Section: Waste utilization |
Keywords: composite cements, blast furnace slag, fly ash |
Autor: V. Feldrappe, A. Ehrenberg. |
In the first seven months of 2014 5,250.6 kt of cement and 3,449.0 kt of clinker were produced, which is, respectively, 16% less and 1.7 % mor...
Issue №4, 2014 |
Section: Ukrainian pages |
Keywords: production of cement and clinker in Ukraine, cement sales, cement consumption by regions of the Ukraine. |
The paper describes a new dry process cement production line at OOO Sengileyevsky Cement Plant. The decision to build it on the site of the old Sengil...
Issue №4, 2014 |
Section: Equipment and technology |
Keywords: cement production, process line, dry process, commissioning work |
Autor: S.M. Zyukolkin, E.V. Schegolyaev. |
The article describes the technology solution for the processing of clay at OOO Tulacement. The original layout and equipment should eliminate problem...
Issue №4, 2014 |
Section: Equipment and technology |
Keywords: clay, dryer-crusher, raw materials moisture |
Autor: J. Lohmann. |
The article describes the experience of reconstruction of OAO Ivano-Frankivskcement with transfering from the wet process to the dry one. The chief co...
Issue №4, 2014 |
Section: Equipment and technology |
Keywords: upgrade, design, dryprocessing |
Autor: V.M. Pirogov, N.V. Makoviychuk, A.G. Demkiv, I.B. Dubas. |