Second terminal of AKKERMANN cement was commissioned in Kazan with modern, fully automated transshipment, equipped with aspiration and aeration systems, a telescopic loader and powerful compressor equipment. Total capacity of silos is 4500 tons; simultaneous loading of products into two cement trucks is possible.
Another new terminal, located in Nizhnekamsk, is equipped with 2 silos that can accommodate 1,100 tons of cement, compressor equipment and receiving bins for 30 tons of material. The time for unloading train cars is 2 hours, the time for loading cement into vehicles is 30 minutes.
In total, four AKKERMANN cement terminals are currently operating in the Republic of Tatarstan - two in Kazan, one in Naberezhnye Chelny and one in Nizhnekamsk.