17.05.2021 13:38

Second terminal of AKKERMANN cement was put into operation in Kazan

Second terminal of AKKERMANN cement was commissioned in Kazan with modern, fully automated transshipment, equipped with aspiration and aeration systems, a telescopic loader and powerful compressor equipment. Total capacity of silos is 4500 tons; simultaneous loading of products into two cement trucks is possible.

Another new terminal, located in Nizhnekamsk, is equipped with 2 silos that can accommodate 1,100 tons of cement, compressor equipment and receiving bins for 30 tons of material. The time for unloading train cars is 2 hours, the time for loading cement into vehicles is 30 minutes.

In total, four AKKERMANN cement terminals are currently operating in the Republic of Tatarstan - two in Kazan, one in Naberezhnye Chelny and one in Nizhnekamsk.

Region: Russia
Tags: production
The use of materials published on the site is allowed only with the reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
Share:  
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy