Journal

The article analyzes the status of the cement industry in Russia and the CIS countries in 2008. It forecasts its development in the next few years. Th...
Issue №2, 2009
Section: Review
Keywords: building materials industry, Eurocement Group, holdings, financial crisis
Autor: M.A. Skorokhod.
The article considers the development of cement industry in Arab countries in 2004–2007. It provides data on the dynamics of the cement and clinker pr...
Issue №2, 2009
Section: Review
Keywords: export, import, GCC countries, Maghreb
Autor: A. Al-Rousan.
The data on cement and clinker production by Ukrainian plants in the 1st quarter of 2009 compared to the 1st quarter of 2008 are given in table 1. The...
Issue №2, 2009
Section: Ukrainian pages
Keywords: test
The article considers the design, action principle and technical characteristics of the equipment produced by Redecam Company – bag filters, electrost...
Issue №2, 2009
Section: Presentation
Keywords: bag filter, filtration, development, flue gas, temperature control
Autor: S. Gellini. Redecam Group.
Under the heading Cement Production Process Stages we have published selections of materials on the subjects of Quarries (№ 6 for 2007) and Gr...
Issue №2, 2009
Section: Stages of production
Keywords: equipment, manufacturing line, burning, clinker production, clinker cooler
A new 2300 tpd semidry clinker production line built for OAO Mordov-Cement by the German companies KHD Humboldt Wedag / ZABIS has been commissioned. T...
Issue №2, 2009
Section: Equipment and technology
Keywords: Mordov-Cement, manufacturing line
Autor: K. Kühne, S.Ya. Tretyakov, E.V. Shchegolyaev.
The article discusses the rotor crushers produced by Sandvik Company with a vertical roll of CV series whose installation upstream of cement ball mill...
Issue №2, 2009
Section: Equipment and technology
Keywords: raw crusher Sandvik, manufacturing activity
Autor: A. Fadeev, J. Fensome.
The article considers the design and technical characteristics of the new-generation burner Duoflex G2 developed by Danish company FLSmidth in 2008. O...
Issue №2, 2009
Section: Equipment and technology
Keywords: fuel feeder, burner construction, impulse response
Autor: C.D. Jensen.
The article presents the results of operating Russia’s largest closed-cycle cement mill produced by FLSmidth (Denmark) and installed at OAO Se...
Issue №2, 2009
Section: Equipment and technology
Keywords: Sebryakov-Cement, mill, installation operation, break-in, productivity
Autor: S.P. Rogachev.
The article describes the equipment for handling loose materials and dust-and-gas purification produced by the German company KREISEL GmbH and Co KG. ...
Issue №2, 2009
Section: Equipment and technology
Keywords: Kreisel, equipment, gas purification, bulk system, assembling
Autor: KREISEL GmbH & Co. KG.

1, 2, 3, 4, 5, ... 14
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy