Filter
ID :  till 
Mnemonic code:
Code in external DB source:
Name:
Tags:
Sorting:  till 
Preview text:
Detailed description:
Activity Start Date: Select date in calendarSelect date in calendar
Activity End Date: Select date in calendarSelect date in calendar
Number of shows:  till 
Information Block type:
Information Block ID:
Information Block mnemonic code:
Information Block name:
Information Block code in external DB source:
Create date: Select date in calendarSelect date in calendar
Описание:
Теги:
Автор:
Рубрика:
  

Journal

ABB’s System 800xA Minerals Library is considered. It is a suite of unique object-oriented software control modules that makes it possible to design p...
Issue №4, 2013
Section: Automation of production
Keywords: software control module, process control, software
Autor: M. Knabenhans.
55 years ago the first cement production line was launched at the plant that now bears the name of ZAO Zhigulevskie Stroimaterialy, and is part of the...
Issue №4, 2013
Section: Jubilees
Keywords: cement production, wet process, dry process
Autor: S. Kolyada.
The article gives information on the capacity changing dynamics of cement production in Russia, output, consumption, export and import latest years. N...
Issue №1, 2014
Section: Review
Keywords: cement production capacity, cement output, dry process
Autor: V.A. Guz, V.I. Zharko, A.A. Kabanov.
The material gives an overview of cement industry in Belarus nowadays.
Issue №2, 2014
Section: Review
Keywords: cement production, dry process, wet chalk
Autor: Ye.Ya. Podluzsky, I.A. Lozhechnikov.
There are still many Portland Cement manufacturing facilities world-wide utilizing long-wet and long-dry pyro-processing technology. In today’s global...
Issue №2, 2014
Section: Equipment and technology
Keywords: modernization, dry process, design
Autor: S. Guinther.
This article describes the design, operation and advantages of the ETA refrigerator, developed and manufactured by Claudius Peters Projects GmbH (...
Issue №2, 2014
Section: Equipment and technology
Keywords: clinker cooler, moving floor, process optimization, heat recuperating, cost reduction
Autor: S. Oehme.
The article reports on the ceremony devoted to commissioning of new greenfield cement plant in Ferzikovo, Kaluga oblast (capacity: 1.86 Mta) o...
Issue №3, 2014
Section: Events
Keywords: Lafarge, Ferzikovo cement plant, technological process, dry production method

1, ... 14, 15, 16, 17, 18
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy