Filter
ID :  till 
Mnemonic code:
Code in external DB source:
Name:
Tags:
Sorting:  till 
Preview text:
Detailed description:
Activity Start Date: Select date in calendarSelect date in calendar
Activity End Date: Select date in calendarSelect date in calendar
Number of shows:  till 
Information Block type:
Information Block ID:
Information Block mnemonic code:
Information Block name:
Information Block code in external DB source:
Create date: Select date in calendarSelect date in calendar
Описание:
Теги:
Автор:
Рубрика:
  

Journal

The aluminium manufacturing industry uses high temperature electrolytic process to produce aluminium from alumina. This process is carried out in a...
Issue №6, 2024
Section: Waste utilization
Keywords: cement production, waste utilization, co-processing, spent pot liner
Autor: U. Parlikar.
The article describes the technology and equipment for the production of clinker and cement at the Hangzhou Shanya South Cement Co., Ltd. plant (C...
Issue №2
Section: Equipment and technology
Keywords: production, cement, clinker, dry process
Autor: Shi Zhenming,, Peng Xinghua, Zhang Jian, Ma Jiaomei, Zhao Liang.
A complex structure-controlled method for processing underburnt lime is that this substance reacts with sulfuric acid at a temperature of 45 °C, and a...
Issue №2
Section: Equipment and technology
Keywords: lime-mud, integrated processing technology, structurecontrolled method, synthetic anhydrite, filtrate, anhydrite cement
Autor: M.A.Komarov,, N.G.Korob, V. Likhavitsky.
In the face of escalating concerns regarding climate change and environmental impact, the cement industry is actively exploring and implementing the u...
Issue №1
Section: Waste utilization
Keywords: alternative fuels, carbon emissions, cement production, co-processing
Autor: F. Leitao .
On September 28, 2023, the Sebryakovsky Cement Plant (now AO Sebryakovcement) celebrated its 70th anniversary. The company has a rich history,...
Issue №4, 2023
Section: Jubilees
Keywords: cement production, modernization, dry process
Autor: G.P. Usacheva.
The alarming rise in waste generation and fall in the availability of fossil fuels have together highlighted the absolute requirement and benefits of ...
Issue №4, 2023
Section: Equipment and technology
Keywords: waste, alternative fuel, co-processing, equipment, Thermal Substitution Rate
Autor: A. Salunke, S. Kumbhar.
A variety of wastes get generated in large quantities during the societal, industrial and agricultural activities undertaken by mankind. These wastes ...
Issue №2, 2023
Section: Waste utilization
Keywords: alternative fuels and raw materials, cement kiln, co-processing, waste utilization, thermal substitution rate
Autor: U. Parlikar.
In 2022, the plants of the Republic of Uzbekistan produced 12.1 Mt of clinker and 14.6 Mt of cement, their total annual production capacity for cement...
Issue №2, 2023
Section: Review
Keywords: cement output, cement production capacities, dry process, construction, modernization
Autor: A.A. Bakhodirov, A.F. Ibragimov.
The article reviews the Russian cement industry in 2022. All indicators are given according to the reporting data of cement enterprises and Rosstat. T...
Issue №6, 2022
Section: Review
Keywords: cement industry, production, consumption, export, import, dry process
Autor: G.Yu. Vasilik, Ye.M. Eremina.
The article discusses the prospects of alternative fuel (RDF) production from wastes and its use at cement plants in accordance with the state...
Issue №1, 2023
Section: Equipment and technology
Keywords: alternative fuel, waste, equipment, process line
Autor: O.N. Kaigorodov, V.M. Glukhovsky.

1, 2, 3, 4, 5, ... 19
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2025 PetroCem Ltd
Privacy policy