The paper describes a project to build a new clinker production line at OAO Sebryakov-Cement. The engineering and equipment supplier was Danish FLSmid...
Issue №6, 2014 |
Section: Equipment and technology |
Keywords: clinker burning process line, dry process, wet raw materials |
Autor: S.P. Rogachev, P. Grydgaard, K.H. Jensen. |
The paper describes a new dry process clinker production line at AO Bekabad-Cement, commissioned in 2013. The characteristics of the basic process equ...
Issue №6, 2014 |
Section: Equipment and technology |
Keywords: process line, clinker, dry process |
Autor: M.V.Yakovlev. |
The paper describes a new plant of the Indian company JK Cement Ltd., located in UAE and commissioned in March 2014. The plant operates the modern dry...
Issue №6, 2014 |
Section: Equipment and technology |
Keywords: cement plant, white cement, grey cement |
Autor: M.P. Rawal, D. Ravisankar, N. Gowrishankar. |
Conventional cement cooling uses water flow that is open to the plant environment leading to issues with efficiency, maintenance, emissions and contam...
Issue №6, 2014 |
Section: Equipment and technology |
Keywords: cement cooling, efficiency improving, cost reducing |
Autor: N. Sutherland, R. Anbari. |
The paper describes the design solutions and the practical experience with elevator belts from AUMUND, Germany. The new design will improve reliabilit...
Issue №5, 2014 |
Section: Equipment and technology |
Keywords: belt bucket elevator, bulk materials conveying, hot bulk material |
Autor: N. Velten. |
Currently many cement plants are facing an urgent problem with sticking and overhanging of material in silos and other process vessels, making the pro...
Issue №5, 2014 |
Section: Equipment and technology |
Keywords: declogging system, aircanon, clogging, wireless control, silos and bunkers cleaning. |
Autor: A.V. Popov, A.N. Kukovenkov, N.V. Zhdanova, I.G. Korolev. |
The article describes an agent for cleaning the gears from lubricants, LUBRICLEAN EP, from French company Lubrilog SA and the method of cleaning the g...
Issue №5, 2014 |
Section: Equipment and technology |
Keywords: open gear drive, abrasive wear, cleaning |
Autor: J.P.P. Merlo. |
The paper describes the reconstruction of the power supply system at OAO Mordov-Cement, which included the construction of a combined cycle power plan...
Issue №5, 2014 |
Section: Equipment and technology |
Keywords: power supply, gas and steam turbine power station |
Autor: S.N. Pyresev. |
The paper describes a new dry process cement production line at OOO Sengileyevsky Cement Plant. The decision to build it on the site of the old Sengil...
Issue №4, 2014 |
Section: Equipment and technology |
Keywords: cement production, process line, dry process, commissioning work |
Autor: S.M. Zyukolkin, E.V. Schegolyaev. |
The article describes the technology solution for the processing of clay at OOO Tulacement. The original layout and equipment should eliminate problem...
Issue №4, 2014 |
Section: Equipment and technology |
Keywords: clay, dryer-crusher, raw materials moisture |
Autor: J. Lohmann. |