Journal
The article considers standard pneumatic unloaders produced by Kovako Materials Handling in a wide range of capacities for ships of various displaceme...
| Issue №4, 2008 |
| Section: Equipment and technology |
| Keywords: Kovako Materials Handling, air-lift unloader, equipment components, unloaders |
| Autor: D. Arrosh. |
The article describes the electric power stations based on piston engines supplied by Wartsila Corporation (Finland) and discusses advantages ...
| Issue №4, 2008 |
| Section: Equipment and technology |
| Keywords: power stations, medium-speed engine, equipment supply |
| Autor: T.M. Kryshina. |
The article describes spiral transporters with a flexible and rigid load-bearing member, their technical parameters and application areas.
| Issue №4, 2008 |
| Section: Equipment and technology |
| Keywords: spiral transporters, equipment |
| Autor: V.D. Shipulin. |
It provides information on a specialized device for electroslag welding by a consumable welding tip. It explains the design features and technical adv...
| Issue №4, 2008 |
| Section: Equipment and technology |
| Keywords: burning kiln, bandages, new equipment |
| Autor: K.A. Yushchenko, I.I. Lychko, S.M. Kozulin, A.A. Fomakin. |
BEUMER Group has almost completed the installation of a belt conveyor for Asia Cement Group in the Chinese province of Sichuan. The major order with a...
| Issue №4, 2008 |
| Section: Equipment and technology |
| Keywords: materials, logistics, engineering problems, route |
| Autor: BEUMER Maschinenfabrik GmbH & Co. KG.. |
The article analyzes the status and development of the cement industry of Azerbaijan and, in particular, of OAO Garadag-Cement. It is assumed that in ...
| Issue №4, 2008 |
| Section: Review |
| Keywords: Holcim, Garadagh-Cement, modernization |
| Autor: K. Abbasov. |
The article examines the history and today’s situation of the Iranian cement industry and cement market.
The country demonstrates high growth rates of...
| Issue №4, 2008 |
| Section: Review |
| Keywords: sector history, demand for cement, investment, ownership structure, white cement, price |
| Autor: L.–A. Bakhshi. |
The article examines the situation in the Turkish construction sector and economy in general in the first half of 2008. It cites the dynamics of cemen...
| Issue №4, 2008 |
| Section: Review |
| Keywords: test |
| Autor: Turkish Cement Manufacturers’ Association. |
The article describes the character and volume of NPO SPb EK operations at cement industry enterprises. It reviews some case studies of installing fre...
| Issue №4, 2008 |
| Section: Presentation |
| Keywords: projects, cement kiln, instrumentation, reconstruction |
| Autor: A.G. Narodnitsky. |
The data on cement and clinker production by Ukrainian plants in the 1st seven and eight months of 2008 compared to the corresponding periods of 2007,...
| Issue №4, 2008 |
| Section: Ukrainian pages |
| Keywords: test |