Filter
ID :  till 
Mnemonic code:
Code in external DB source:
Name:
Tags:
Sorting:  till 
Preview text:
Detailed description:
Activity Start Date: Select date in calendarSelect date in calendar
Activity End Date: Select date in calendarSelect date in calendar
Number of shows:  till 
Information Block type:
Information Block ID:
Information Block mnemonic code:
Information Block name:
Information Block code in external DB source:
Create date: Select date in calendarSelect date in calendar
Описание:
Теги:
Автор:
Рубрика:
  

Journal

The article considers the interrelation between the structure of cement stone during its formation at the stage of hydration and the rate of hydration...
Issue №1, 2007
Section: Application of cement
Keywords: hydration, retarder, cement stone
Autor: Yu.A. Belentsov.
The article cites the results of a study of sources of chromium ingress in cement at every stage of its production. It is shown that the main source o...
Issue №1, 2007
Section: Science and production
Keywords: chromium, crude processing unit, safety
Autor: I.N. Borisov, E.V. Indina..
The article characterizes laboratory mill RS 200 produced by Retsch Company and intended for preparation of hard, brittle и fibrous materials for anal...
Issue №1, 2007
Section: Control of production
Keywords: grinding, milling bowl
Autor: H. Neumann.
In connection with the current revival of hydro-engineering projects in Siberia, there is an ever greater need for special cements increases for hydra...
Issue №1, 2007
Section: Special binders
Keywords: hydraulic engineering, requirements document, special cements
Autor: E.I. Alliluyeva, L.M. Garkun.
The article, devoted to the anniversary o ZAO Novoros-Cemremont, considers the role of this enterprise in today’s structure of the Russian cement indu...
Issue №1, 2007
Section: Jubilees
Keywords: Novoros-Cemremont, assembling, modernization, reconstruction
The article reviews the process control systems that are used now and will be used in the near future. For new investments or expansion of the existin...
Issue №1, 2007
Section: Automation of production
Keywords: administrative system, manufacturing oriented PC
Autor: M. Shertel.
On the whole, the year 2006 was one of positive dynamics of development for the Ukrainian cement industry. Compared to the figures of 2005, the level ...
Issue №1, 2007
Section: Ukrainian pages
Keywords: test
The article cites the results of operations of OAO Spassk-Cement in 2006 aimed at escalating the volume of cement production and modernization of tech...
Issue №1, 2007
Section: Companies and firms
Keywords: Spassk-Cement, modernization, engineering procedure, product quality
Autor: I.S. Sokolyuk.
The dynamic development of the Russian construction sector over the last nine years predetermined the resurgence of the construction materials industr...
Issue №1, 2008
Section: Review
Keywords: building sector, cement production, cement consumption, export, import
Autor: V.I. Zharko, V.I. Shubin.
This issue is going to press on the eve of the 5th International PETROCEM conference and, according to tradition, it provides information on the statu...
Issue №1, 2008
Section: Review
Keywords: resource, cement industry, price, investment, modernization, cement plants

1, ... 108, 109, 110, 111, 112, ... 217
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy