06.06.2024 05:53

New front loader at "Ahangarancement" plant

Chinese-made special vehicle arrived at Ahangarancement plant (part of Akkermann cement) in May and will be used in the mining shop for transportation of rocks (limestone, marl).

"By regularly renewing and expanding the plant's vehicle fleet, we are decommissioning old equipment. The new equipment is compact, modern and can maneuver confidently on the quarry roads. The machine with a lifting capacity of 12 tons and bucket volume of 6.5 cubic meters can work up to 24 hours a day. It speeds up loading and unloading, increases the number of trips, and there will be much less downtime," says Kashifkhan Yuldashev, Head of Column No. 2 of specialized vehicle workshop.

Region: Uzbekistan
The use of materials published on the site is allowed only with the reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
Share:  
The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy